Scheduling
Crews, dates and sites for the coming week, plus the messages coming in from the vans.
Crews, week of 3 August
Three crews and one survey appointment. Travel time is not blocked out.
Mon 3 Aug
7:00 AM
Sedgwick crew · AU-2418 Johnstown
Remaining glass infill
7:00 AM
Harker crew · AU-2365 Punxsutawney
Gate installation, day 1 of 3
9:00 AM
M. Kirkbride · AU-2344 Clearfield
Survey of the lobby once the existing dimensions are settled
Tue 4 Aug
7:00 AM
Harker crew · AU-2365 Punxsutawney
Gate installation, day 2 of 3
7:30 AM
Sedgwick crew · AU-2431 Altoona
Window units, first floor start
Wed 5 Aug
7:00 AM
Harker crew · AU-2365 Punxsutawney
Gate installation, day 3 of 3
7:30 AM
Sedgwick crew · AU-2431 Altoona
Window units, day 2
10:00 AM
Handover AU-2418 Johnstown
with the client · T. Plowright
Thu 6 Aug
7:30 AM
Sedgwick crew · AU-2431 Altoona
Window units, day 3
8:00 AM
Harker crew · not yet allocated
no job scheduled, and the Punxsutawney access road closes today
Fri 7 Aug
7:30 AM
Sedgwick crew · AU-2431 Altoona
Window units, day 4
1:00 PM
Workshop · timesheets
Hand in by 2:00 PM, payroll runs afterwards
Sites by state
Each job appears exactly once. The count above each column refers to this view.
Material to clear
1 siteAU-2344 Clearfield medical center
Entrance lobby · glass reordered
$16,960.00Survey 3 Aug
Scheduled
2 sites · week 32AU-2365 Punxsutawney depot
Gate installation · Harker crew
$22,310.003 to 5 Aug
AU-2431 Altoona after-school center
Window units · Sedgwick crew
$42,180.00from 4 Aug
Under way
2 sites · 2 crewsAU-2418 Johnstown business park
Canopy · Sedgwick crew, day 3 of 4
$26,480.00Variation unapproved
AU-2356 Hollidaysburg recreation center
Fire escape doors · Norwood crew
$14,220.00Day 2 of 2
Ready for handover
2 sitesAU-2402 Hall 2 Latrobe
Industrial door · T. Plowright
$31,900.00Today at 2:00 PM
AU-2372 Lewistown car dealership
Sliding gate · punch list cleared
$8,940.00Date open
Handed over
2 jobs · $71,220.00AU-2389 Kittanning office building
Staircase · handed over 22 July
$58,740.00Final invoice open
AU-2301 Ebensburg day care center
Railings · handed over 12 June
$12,480.00Invoice overdue
Messages from site
Entered by the fitters through the app, unfiltered.
AU-2418 · glass infill missing
29 Jul, 3:40 PM · R. SedgwickThe supplier promises delivery on Monday. The lift platform would then have to be kept until Tuesday.
Obstruction
AU-2344 · existing dimensions differ from the drawing
28 Jul, 10:12 AM · M. KirkbrideClear width is 30 mm narrower than drawn. A new survey is needed and fabrication has stopped.
Survey
AU-2365 · access road closed from 6 Aug
27 Jul, 8:05 AM · clientRoad closure inside the depot. Delivery of the gate has to be brought forward.
Scheduling
AU-2402 · punch list cleared
26 Jul, 4:30 PM · T. PlowrightDoor leaf seal replaced, emergency stop labeled. The handover can go ahead.
Handover
AU-2356 · reported complete
25 Jul, 2:20 PM · P. NorwoodFire escape doors fitted and adjusted, the handover record was signed on site.
Completion
How Awelior would approach this project
Hollins Metalwork & Fabrication LLC is invented — the way it is built is not. None of this is work delivered for a client. It is the shape we would give such a project — with the same depth, but without a client who would have to answer for it.
Where it starts
At Hollins Metalwork & Fabrication LLC a job starts with a quotation, moves through survey and installation planning, consumes stock from the store and ends in a final invoice. Along the way it sits in a binder, on the magnet board, in the costing sheet and on timesheets that come out of the vans on Friday. Nobody can say on Monday what a live job has cost so far.
Decisions
One job, one number, from quotation to invoice
The whole route hangs off the same job number. That sounds obvious and is the actual break with the old way: previously every station had its own filing, and pulling it together was manual work at month end.
Scheduling as a calendar next to the board
Two views of the same week: the calendar for “who is where and when”, the board for “what is still unscheduled”. The magnet board in the office could only do the second — so the first was carried in somebody's head.
Hours and materials on the job, not in accounts
Both are captured where they arise and are attached to the job immediately. Only then does the overview show a running cost comparison that is right during the work rather than after it.
Deliberately left outNo drawing management and no CAD integration. Design data has its own tools, its own revision control and its own specialists; pulling it into a job book would be the start of a second project under a false name.
What is in it
- Screens
- 5
- Content blocks
- 18
- Languages
- 4
Five screens, in all four languages, with sidebar, header and stated role. Navigation works; tables, step chains, history, calendar and forms are rendered and inert. All job numbers and amounts are invented.
How it would go on
Time recording in the van
Hours have to be captured where the work happens — offline-capable, because a building site rarely has a signal.
Accounting
Invoices belong in the finance ledger, payments received belong back on the job. Without that return path the payment status becomes a second version of the truth.
Survey and handover
A signature on site, photographs, a snagging list. That is where a job book stops and a site app begins.
An application like this for your business?
Job Book is invented — the way it is cut is not. Applications like this come out of the processes a business already runs.
Sample application by Awelior. Invented business, invented data, nothing stored.