Deadline DeskHargreave Property Management
Signed in as Property management and contracts
Sample dataProperty management and contracts
Contract file DOK-2024-0117
One document with everything attached to it: versions, approval trail, deadlines and history.
Elevator maintenance contract
in force — notice period runningDOK-2024-0117 · 42 Fairview Avenue, Rochester, NY 14607
Contract
- Counterparty
- PrimeLift Engineering LLC, Buffalo
- Type
- Maintenance contract with fault call-out
- Start
- January 1, 2024
- Term
- 3 years, ending December 31, 2026
- Renewal
- by 12 months unless terminated in time
Deadlines
- Notice period
- 3 months to the end of the term
- Termination on notice possible until
- September 30, 2026
- Follow-up
- July 31, 2026 — rule: 60 days before the deadline, moved to the preceding working day
- Retention
- 10 years after the contract ends — house rule, see Filing
Filing and access
- Filing location
- Properties / 42 Fairview Avenue / Contracts
- Version in force
- v4 of March 12, 2026
- Permissions
- Property management (read, edit), Accounts (read)
- Sign-off
- given on March 14, 2026 by S. Whitfield
Versions
| Version | Date | Change | Filed by | Status |
|---|---|---|---|---|
| Draft | DateJul 28, 2026 | ChangeDraft of a termination letter | Filed byM. Fenwick | Statusnot approved |
| v4 | DateMar 12, 2026 | ChangeAddendum on the maintenance fee, schedule 2 restated | Filed byM. Fenwick | Statusin force |
| v3 | DateSep 4, 2025 | ChangeFault call-out extended to Saturdays | Filed byS. Whitfield | Statussuperseded |
| v2 | DateJan 17, 2025 | ChangeContacts and phone numbers updated | Filed byK. Sinclair | Statussuperseded |
| v1 | DateDec 19, 2023 | ChangeFirst version, signed by both sides | Filed byR. Hargreave | Statussuperseded |
Older versions stay readable and are never overwritten. The version in force is v4.
Approval trail of the version in force
Uploaded
Mar 12, 2026 · M. Fenwick
Technical review
Mar 13, 2026 · Property management
Sign-off given
Mar 14, 2026 · S. Whitfield
Set as the version in force
Mar 14, 2026
Follow-up before the deadline
due today, July 31
Decision on termination
by September 30
History
Draft filed
Jul 28, 9:14 AMA draft termination letter was filed and flagged as a draft. A draft never becomes the version in force.
M. Fenwick
Comparison quote requested
Jul 14, 4:02 PMA quote was requested from a second maintenance firm so there is something to decide on at the follow-up on July 31.
S. Whitfield
Sign-off given
Mar 14, 11:37 AMVersion 4 reviewed and set as the version in force; version 3 superseded.
S. Whitfield
Version 4 uploaded
Mar 12, 8:50 AMAddendum on the maintenance fee, returned signed by the counterparty.
M. Fenwick
Permissions extended
Jan 9, 10:20 AMAccounts granted read access to the contract file so invoices can be matched to the contract.
R. Hargreave
How Awelior would approach this project
Hargreave Property Management is invented — the way it is built is not. None of this is work delivered for a client. It is the shape we would give such a project — with the same depth, but without a client who would have to answer for it.
Where it starts
Hargreave Property Management looks after 38 properties with contracts, inspection records and notice periods. The contracts sit in binders and in a network folder called “Contracts_new_final”, the deadlines in a spreadsheet. What gets missed is rarely the contract but the date: an automatic renewal that goes through because nobody looked in time.
Decisions
The deadline is the center, not the document
A document system that only files replaces one binder with another. So the follow-up date is the load-bearing structure — the contract record hangs off it, not the other way round.
Every document belongs to a property
Every contract attaches to a property. Across 38 buildings that is the only order that survives a change of case handler; filing by contract type does not.
Permissions on a screen of their own
Who may see which file is a domain question in property management, not a background setting. So it stands as its own area next to the archive.
Deliberately left outNo text recognition and no automatic deadline extraction from contract wording. A misread notice period is more dangerous than none at all — it looks like a fact and is a guess.
What is in it
- Screens
- 5
- Content blocks
- 18
- Languages
- 6
Five screens, in all languages, with sidebar, header and stated role. Navigation works; tables, filters, calendar, step chains, history and forms are rendered and inert. Properties, contracts and deadlines are invented.
How it would go on
Actually storing documents
Location, versions, permissions and backup — plus the route by which a scanned contract finds its way to the right property.
Reminders that arrive
A follow-up has to reach somebody out of the system: mailbox, task list, cover during leave.
Retention and deletion
Commercial and tax retention periods on one side, deletion duties on the other. The same archive has to serve both.
An application like this for your business?
Deadline Desk is a made-up example. A real application follows the processes your business already runs.
Sample application by Awelior. Invented business, invented data, nothing stored.