Deadline DeskHargreave Property Management
Signed in as Property management and contracts
Sample dataProperty management and contracts
Deadlines and follow-ups
Everything that can run out, with the day the application speaks up.
6
Follow-ups today
July 31
23
Follow-ups this week
4
Deadlines within 14 days
3 notice periods, 1 inspection
16
Contracts with no deadline stored
deadline to be added
This week
Deadlines, follow-ups and appointments across all 38 properties.
Mon, Jul 27
all day
Follow-up: 2025 resolutions file
5 Brookfield Lane · K. Sinclair
10:00 AM
Drinking water lab result scanned
9 Elmhurst Road · M. Fenwick
Tue, Jul 28
all day
Follow-up: 4 contracts
Property management
Wed, Jul 29
9:00 AM
Sign-off due: drinking water result
9 Elmhurst Road · M. Fenwick
all day
Follow-up: 3 insurance policies
K. Sinclair
Thu, Jul 30
all day
Follow-up: 5 inspection reports
M. Fenwick
Fri, Jul 31
all day
Deadline: stairwell cleaning contract
Termination on notice — 42 Fairview Avenue
all day
Follow-up: elevator maintenance contract
60 days before the notice deadline · S. Whitfield
2:00 PM
Retention run 2026
produces a proposal list, deletes nothing
Deadlines in the next 90 days
| Document | Type of deadline | Deadline | Days | Follow-up | Status |
|---|---|---|---|---|---|
| Stairwell cleaning contract — 42 Fairview Avenue | Type of deadlineTermination on notice | DeadlineJul 31 | Days0 | Follow-upJul 1 | Statusfalls today |
| Drinking water test report — 9 Elmhurst Road | Type of deadlineSign-off | DeadlineAug 5 | Days5 | Follow-upJul 29 | Statusopen |
| Statutory elevator inspection — 42 Fairview Avenue | Type of deadlineRecurring inspection | DeadlineAug 14 | Days14 | Follow-upJul 15 | Statusdate confirmed |
| Caretaker services framework agreement | Type of deadlineTermination on notice | DeadlineAug 31 | Days31 | Follow-upJul 1 | Statusunder review |
| Grounds maintenance contract — 5 Brookfield Lane | Type of deadlineEnd of term after notice | DeadlineAug 31 | Days31 | Follow-upAug 17 | Statusterminated |
| Elevator maintenance contract — 42 Fairview Avenue | Type of deadlineTermination on notice | DeadlineSep 30 | Days61 | Follow-upJul 31 | Statusfollow-up today |
| Building insurance — 9 Elmhurst Road | Type of deadlineTermination on notice | DeadlineSep 30 | Days61 | Follow-upAug 15 | Statusopen |
| Smoke alarm maintenance contract — several properties | Type of deadlineRecurring inspection | DeadlineOct 15 | Days76 | Follow-upSep 15 | Statusopen |
8 deadlines in the next 90 days. The day count is measured from July 31.
Create a follow-up
Demo form — nothing entered here is saved.
Taken from the contract, editable case by case.
Stored rule: 60 days before the deadline, moved to the preceding working day.
Appears in the preview of the follow-up.
How Awelior would approach this project
Hargreave Property Management is invented — the way it is built is not. None of this is work delivered for a client. It is the shape we would give such a project — with the same depth, but without a client who would have to answer for it.
Where it starts
Hargreave Property Management looks after 38 properties with contracts, inspection records and notice periods. The contracts sit in binders and in a network folder called “Contracts_new_final”, the deadlines in a spreadsheet. What gets missed is rarely the contract but the date: an automatic renewal that goes through because nobody looked in time.
Decisions
The deadline is the center, not the document
A document system that only files replaces one binder with another. So the follow-up date is the load-bearing structure — the contract record hangs off it, not the other way round.
Every document belongs to a property
Every contract attaches to a property. Across 38 buildings that is the only order that survives a change of case handler; filing by contract type does not.
Permissions on a screen of their own
Who may see which file is a domain question in property management, not a background setting. So it stands as its own area next to the archive.
Deliberately left outNo text recognition and no automatic deadline extraction from contract wording. A misread notice period is more dangerous than none at all — it looks like a fact and is a guess.
What is in it
- Screens
- 5
- Content blocks
- 18
- Languages
- 6
Five screens, in all languages, with sidebar, header and stated role. Navigation works; tables, filters, calendar, step chains, history and forms are rendered and inert. Properties, contracts and deadlines are invented.
How it would go on
Actually storing documents
Location, versions, permissions and backup — plus the route by which a scanned contract finds its way to the right property.
Reminders that arrive
A follow-up has to reach somebody out of the system: mailbox, task list, cover during leave.
Retention and deletion
Commercial and tax retention periods on one side, deletion duties on the other. The same archive has to serve both.
An application like this for your business?
Deadline Desk is a made-up example. A real application follows the processes your business already runs.
Sample application by Awelior. Invented business, invented data, nothing stored.