Project FlowSinclair & Pryce Consulting Engineers

Sample data

P-2451 — New workshop hall, Elkhart

One project with its estimate, its work stages, its work packages and its history.

P-2451 — New workshop hall, Elkhart

In progress

Sandiford Steel Fabrications LLC · structural design and site supervision

Commission

Order number
A-2026-018
Commissioned
Feb 12, 2026
Scope of service
Structural design stages 1–6, site supervision stage 8
Client contact
Mr. Sandiford, president

Estimate

Fee, net
$184,000.00
Hours estimated
1,480 h
Hours booked
1,154 h
Budget used
78 %
Average hourly rate
$124.00

Status and dates

Project lead
Miriam Pryce
Current work stage
Stage 5 — detailed design
Next milestone
Shell drawings handed over, Aug 21
Variation orders
1 instructed, 1 under review

Work stages

  1. Stage 1 — appraisal

    completed Feb 24

  2. Stage 2 — concept design

    completed Mar 19

  3. Stage 3 — developed design

    completed May 6

  4. Stage 4 — planning submission

    consent granted Jul 2

  5. Stage 5 — detailed design

    under way · 74 % of package hours booked

  6. Stage 6 — tender preparation

    planned from Sep 9

  7. Stage 8 — site supervision

    planned from Nov 4

Work packages

Estimated against booked hours. A negative remainder means the package has run over.

Work packageResponsibleEstimatedBookedRemainingStatus
Structural analysis of the portal framesResponsibleMiriam PryceEstimated260 hBooked268 hRemaining−8 hStatusOver
Foundations and ground slabResponsibleThomas ClarkeEstimated180 hBooked142 hRemaining38 hStatusUnder way
Formwork and reinforcement drawingsResponsibleLucy SparrowEstimated420 hBooked311 hRemaining109 hStatusUnder way
Steel fabrication drawings (variation N-01)ResponsiblePaul JacobsEstimated160 hBooked74 hRemaining86 hStatusVariation instructed
Structural fire safety statementResponsibleRuth OsborneEstimated90 hBooked96 hRemaining−6 hStatusCompleted
Support for the checking engineerResponsibleMiriam PryceEstimated120 hBooked48 hRemaining72 hStatusOpen

Packages estimated 1,230 h · booked 939 h · plus 215 h of internal project hours, 250 h held in reserve

History

  1. Variation order N-02 submitted

    Jul 29, 4:20 PM

    Additional check of the crane runway, 40 h at $128.00. Waiting for written instruction.

    Miriam Pryce

  2. Interim invoice 3 sent

    Jul 24, 9:05 AM

    $42,000.00 against assessed progress on stage 4, due Aug 7.

    Kate Mullins

  3. Estimate revised

    Jul 17, 11:40 AM

    Variation N-01 (steel fabrication drawings) added to the estimate with $20,000.00 in fees and 160 h.

    Edward Sinclair

  4. Planning consent granted

    Jul 2, 8:15 AM

    Stage 4 complete, the decision notice is filed in the project folder.

    Thomas Clarke

  5. Package hours reached

    Jun 18, 2:30 PM

    The work package “Structural analysis of the portal frames” has used 100 % of its estimated hours.

    automatic notice

The project frame

How Awelior would approach this project

Sinclair & Pryce Consulting Engineers is invented — the way it is built is not. None of this is work delivered for a client. It is the shape we would give such a project — with the same depth, but without a client who would have to answer for it.

Where it starts

Sinclair & Pryce Consulting Engineers work in defined work stages against agreed fees. Hours sit in one spreadsheet per engineer, budgets in a second, and the invoicing tool knows about neither. A project can therefore run over for months without anyone noticing — it gets noticed when the invoice goes out and the number does not fit.

Decisions

  • Hours and budget side by side, not one after the other

    On the project screen the consumption sits next to the allowance per work stage. That is the only presentation a decision can be taken from while the work is running — a month-end report is news, not steering.

  • Work stages as a step chain

    In an engineering practice a project is not a bar with a percentage on it, but a sequence of clearly named stages with handovers. The step chain shows exactly that and spares everyone the question of what “60 per cent done” is supposed to mean.

  • Time recording on a screen of its own

    It is the screen everyone uses daily — and the one a system like this dies on if it is awkward. So it sits as an equal in the sidebar rather than buried inside the project.

Deliberately left outNo cross-project resource planning and no utilization forecast. A forecast built on figures that are only just being captured properly would be a claim — it comes once the data has held up for a year.

What is in it

Screens
5
Content blocks
19
Languages
6

Five screens, in all languages, with sidebar, header and stated role. Navigation works; tables, board, charts, step chains, history and forms are rendered and inert. Project numbers and amounts are invented.

How it would go on

  • Fee regulations

    Chargeable costs, fee bands and refurbishment surcharges have to sit inside the allowance, or the system calculates past the agreement.

  • Accounting and payments received

    Interim invoices, the final invoice and outstanding items belong together, so that project status also knows payment status.

  • Document storage

    Drawings, minutes, correspondence — with revisions, and the question of what is kept for how long after completion.

Talk through your project

Sample data

An application like this for your business?

Project Flow is a made-up example. A real application follows the processes your business already runs.

Sample application by Awelior. Invented business, invented data, nothing stored.