Back to the software solutions

Example site for an entirely fictional business — not a real company.

Project FlowSinclair & Pryce Consulting Engineers

Sample data

Time tracking

Book hours, check the week, send the timesheet off for approval.

32.5 h

booked in week 31

40.0 h contracted

25.0 h

of that billable

across four projects

7.5 h

non-project hours

training and quoting

14

unapproved timesheets in the office

oldest waiting 11 days

Waiting for the project lead

Only approved hours feed into progress and invoicing.

  • Lucy Sparrow — week 30

    39.0 h across three projects

    Two entries with no work package: 6.0 h on P-2462.

    unapproved

  • Paul Jacobs — week 30

    41.5 h, of which 4.0 h on variation N-01

    Variation hours only become billable once the client instructs them in writing.

    check

  • Ruth Osborne — week 30

    36.0 h across two projects

    Complete, with a description against every entry.

    ready

  • Thomas Clarke — week 29

    40.0 h on one project

    Unapproved for 11 days and holding up the interim invoice for P-2419.

    overdue

My entries — week 31

DateProjectWork packageHoursTypeStatus
27 JulProjectP-2451Work packageFormwork and reinforcement drawingsHours6.5 hTypebillableStatusapproved
27 JulProjectP-2419Work packageEast Square site supervisionHours1.5 hTypebillableStatusapproved
28 JulProjectP-2451Work packageStructural analysis of the portal framesHours8.0 hTypebillableStatusapproved
29 JulProjectP-2462Work packageAeration tank concept designHours4.0 hTypebillableStatusopen
29 JulProjectinternalWork packageEurocode 3 trainingHours4.0 hTypenot billableStatusopen
30 JulProjectP-2451Work packageSteel fabrication drawings (N-01)Hours5.0 hTypebillableStatusunder review
31 JulProjectinternalWork packageP3 parking structure quoteHours3.5 hTypenot billableStatusopen

Week to date 32.5 h · billable 25.0 h · not billable 7.5 h

New entry

The entry appears in this week's timesheet straight away and stays editable until the project lead approves it.

Project
P-2451 — New workshop hall, Elkhart
Work package
Formwork and reinforcement drawings

Only packages belonging to the selected project, open ones first.

Quarter-hour steps — 0.25 is 15 minutes.

Type
billable

This appears on the timesheet attached to the invoice — write it the way the client should read it.

This form does not submit anything.
The project frame

How Awelior would approach this project

Sinclair & Pryce Consulting Engineers is invented — the way it is built is not. None of this is work delivered for a client. It is the shape we would give such a project — with the same depth, but without a client who would have to answer for it.

Where it starts

Sinclair & Pryce Consulting Engineers work in defined work stages against agreed fees. Hours sit in one spreadsheet per engineer, budgets in a second, and the invoicing tool knows about neither. A project can therefore run over for months without anyone noticing — it gets noticed when the invoice goes out and the number does not fit.

Decisions

  • Hours and budget side by side, not one after the other

    On the project screen the consumption sits next to the allowance per work stage. That is the only presentation a decision can be taken from while the work is running — a month-end report is news, not steering.

  • Work stages as a step chain

    In an engineering practice a project is not a bar with a percentage on it, but a sequence of clearly named stages with handovers. The step chain shows exactly that and spares everyone the question of what “60 per cent done” is supposed to mean.

  • Time recording on a screen of its own

    It is the screen everyone uses daily — and the one a system like this dies on if it is awkward. So it sits as an equal in the sidebar rather than buried inside the project.

Deliberately left outNo cross-project resource planning and no utilization forecast. A forecast built on figures that are only just being captured properly would be a claim — it comes once the data has held up for a year.

What is in it

Screens
5
Content blocks
19
Languages
4

Five screens, in all four languages, with sidebar, header and stated role. Navigation works; tables, board, charts, step chains, history and forms are rendered and inert. Project numbers and amounts are invented.

How it would go on

  • Fee regulations

    Chargeable costs, fee bands and refurbishment surcharges have to sit inside the allowance, or the system calculates past the agreement.

  • Accounting and payments received

    Interim invoices, the final invoice and outstanding items belong together, so that project status also knows payment status.

  • Document storage

    Drawings, minutes, correspondence — with revisions, and the question of what is kept for how long after completion.

Talk through your project

Sample data

An application like this for your business?

Project Flow is invented — the way it is cut is not. Applications like this come out of the processes a business already runs.

Sample application by Awelior. Invented business, invented data, nothing stored.